Showing posts with label Extreme Bathroom Makeover. Show all posts
Showing posts with label Extreme Bathroom Makeover. Show all posts

Sunday, June 10, 2007

On the Fourth Day.... We Drywalled

In the continuing saga of the bathroom of Jan versus the "motley crew", we see noticable progress on the fourth day. Plumbing has plumb. Electricity has been electrified. Drywall has been installed and the room now looks much smaller!

Thank you for your continued prayers. We have now had 1.2 accident (and fatality) free days on the jobsite.

Dan showing how to cut metal with fire....



















Making the pipes sing....















Today was "Steves in Red Shirts" day.....














This is Adam - he is "uber" drywall and tile installer .... a "Professional"



















For insurance reasons, we cannot reveal the face of the man doing this...



















Steve is about to demonstrate an apendectomy to Dan...














The "Design Consultants" for the Project arrived today...















"ahhh, so close, and yet.... so far to go".....

Friday, June 8, 2007

"Extreme makeover" - The Finish Line....

Progress is made each day!

On "day 5"
Adam and Russ installed the shower tile and floor tiles and taped and mudd'ed the walls....



















Day 6!
Now the Primer is on, and notice the plumbing is "plumbed"....
Russ and Dave worked on this all day!


















Day 7 -
Let there be Paint! (notice some of it is in Michael's hair...)
















Day 8 - Jan is home!
Here she is performing the VERY FIRST flush test....




















The Finished Product...









































A special thanks to Steve, Russ, Vern, Dave, Adam, Teri and John for helping to push through to the end.