In the continuing saga of the bathroom of Jan versus the "motley crew", we see noticable progress on the fourth day. Plumbing has plumb. Electricity has been electrified. Drywall has been installed and the room now looks much smaller!
Thank you for your continued prayers. We have now had 1.2 accident (and fatality) free days on the jobsite.
Dan showing how to cut metal with fire....
Making the pipes sing....
Today was "Steves in Red Shirts" day.....
This is Adam - he is "uber" drywall and tile installer .... a "Professional"
For insurance reasons, we cannot reveal the face of the man doing this...
Steve is about to demonstrate an apendectomy to Dan...
The "Design Consultants" for the Project arrived today...
"ahhh, so close, and yet.... so far to go".....
Thank you for your continued prayers. We have now had 1.2 accident (and fatality) free days on the jobsite.
Dan showing how to cut metal with fire....
Making the pipes sing....
Today was "Steves in Red Shirts" day.....
This is Adam - he is "uber" drywall and tile installer .... a "Professional"
For insurance reasons, we cannot reveal the face of the man doing this...
Steve is about to demonstrate an apendectomy to Dan...
The "Design Consultants" for the Project arrived today...
"ahhh, so close, and yet.... so far to go".....
No comments:
Post a Comment